SCAFFOLD+MASONRY
This project consists of the masonry and the temporary scaffolding theater for the summer seasons. The masonry is used as a storage and in it there is a workshop and an office. The office connects to the temporary theater and it is one of the ways for the staff and performers to have direct access between the masonry and stage. On the ground floor, there is a garden that extend right under where the scaffolding ends. Beside it, there’s an entry way and a slide to the kid’s storage and playroom underneath the tennis court entrance and storage.
The shelving system used in the masonry is made to be accessible from both sides. In between the shelving systems, there is a pathway for people to access some tools that are stored higher. The screening for the temporary theater is designed in a half translucent material that allows audiences to see the performers while projections are made onto the screen. These screens could be put up and stored.